Is it possible to specify the bridge technology also while creating a bridge in ari?

The mixing technology in bridge changes from simple bridge to softmix after unholding a channel. Is it possible to specify the bridge technology also while creating the bridge in ari?

No, it is written/designed to adjust between bridge implementations transparently as needed based on conditions and requirements.

@jcolp Thank you for your answer

This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.