# Asterisk register calls but doesn't answere it

**URL:** <https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183>\
**Category:** Asterisk Support\
**Created:** [June 20, 2006, 10:45am UTC](https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183 "2006-06-20T10:45:39Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![prodigy7](https://avatars.discourse-cdn.com/v4/letter/p/7cd45c/32.png) [@prodigy7](https://community.asterisk.org/u/prodigy7)\
**Post date:** [June 20, 2006, 10:45am UTC](https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183/1 "2006-06-20T10:45:39Z")

</div>

Hi,

i’m new to asterisk (working since 3 days with it) but i’m and intermediate linuxman 😄

I try to build an voicemail only server for sip with asterisk but i’ve the problem, that asterisk show the calls but doesn’t answere it (with voicebox) and the caller hears the message “there is no connection for the number you have dialed” and started with the second call “the number is temporairly not available”.

Ok, first some facts:

The number  
The number i’ve registered on my provider (1&1) specially only for voicemail things. There is no other server/device which register the number for use

Network  
The asterisk runs behind an AVM FritzBox. The FritzBox use 5060 for own SIP-things so i take 5062. I also configure an portforwarding on the fritzbox to my asterisk server:  
[ul][li]5062 UDP[/li]  
[li]30000-30019 UDP[/li]  
[li]5062 TCP[/li][/ul]  
The asterisk server in my network use the ip 192.168.100.100 (you’ll find it in the log files)

System  
The system is an linkstation which use Debian Sarge for MIPSel. Asterisk has the version 1.2.7.1.

The configuration  
That’s my current configuration (only the importent parts - if more configuration information needed, request it):  
sip.conf

[code][general]  
bindport=5062  
bindaddr=0.0.0.0  
context=default  
tos=reliability  
srvlookup=yes  
nat=yes  
qualify=yes  
language=de  
canreinvite=no  
localnet=192.168.100.0/255.255.255.0  
externhost=.homeip.net  
disallow=all  
allow=ulaw  
allow=alaw  
callevents=yes  
maxexpire=1200  
defaultexpire=1200

register=496144xxxxxx:@sip.1und1.de:5062/496144xxxxxx

; 1&1 Outgoing  
[496144xxxxxx]  
type=peer  
username=496144xxxxxx  
fromuser=496144xxxxxx  
secret=  
[host=1und1.de](http://host=1und1.de)  
[fromdomain=1und1.de](http://fromdomain=1und1.de)  
insecure=very  
quality=600  
caninvite=no  
canreinvite=no  
nat=yes  
disallow=all  
allow=ulaw  
allow=alaw  
dtmfmode=inband  
qualify=1000  
content=1und1from

; 1&1 Incoming  
[1und1\_in]  
type=peer  
[fromdomain=1und1.de](http://fromdomain=1und1.de)  
[host=1und1.de](http://host=1und1.de)  
[/code]

rtp.conf

`[general]
rtpstart=30000
rtpend=30019
`

extensions.conf

[code][general]  
static=yes  
writeprotect=no  
autofallthrough=yes

[globals]

[default]

[local]

[1und1from]  
exten =\> 496144xxxxxx,1,Voicemail(u496144xxxxxx)  
exten =\> 496144xxxxxx,2,Voicemail(u496144xxxxxx)  
exten =\> 496144xxxxxx,3,Voicemail(u496144xxxxxx)  
exten =\> 496144xxxxxx,4,Voicemail(u496144xxxxxx)  
exten =\> 496144xxxxxx,5,Voicemail(u496144xxxxxx)  
[/code]

voicemail.conf

[code][general]  
format = wav  
maxmessage = 180  
serveremail = asterisk@  
attach = yes  
fromstring = Voicemail  
emailbody = Sie haben eine neue Voicemail.

[default]  
496144xxxxxx =\> 1234,prodigy7,contact@[/code]

The logfiles  
The following output i get when i start asterisk with -vgd:

Startscreen

# [code]Asterisk 1.2.7.1, Copyright © 1999 - 2006 Digium, Inc. and others. Created by Mark Spencer [markster@digium.com](mailto:markster@digium.com) Asterisk comes with ABSOLUTELY NO WARRANTY; type ‘show warranty’ for details. This is free software, with components licensed under the GNU General Public License version 2 and other licenses; you are welcome to redistribute it under certain conditions. Type ‘show license’ for details.

Asterisk Event Logger Started /var/log/asterisk/event\_log  
Asterisk Dynamic Loader loading preload modules:  
Jun 20 12:19:28 NOTICE[2436]: manager.c:1678 init\_manager: Unable to open management configuration manager.conf. Call management disabled.  
Jun 20 12:19:28 NOTICE[2436]: cdr.c:1191 do\_reload: CDR simple logging enabled.  
Asterisk PBX Core Initializing  
Registering builtin applications:  
[AbsoluteTimeout]  
[Answer]  
[BackGround]  
[Busy]  
[Congestion]  
[DigitTimeout]  
[Goto]  
[GotoIf]  
[GotoIfTime]  
[ExecIfTime]  
[Hangup]  
[NoOp]  
[Progress]  
[ResetCDR]  
[ResponseTimeout]  
[Ringing]  
[SayNumber]  
[SayDigits]  
[SayAlpha]  
[SayPhonetic]  
[SetAccount]  
[SetAMAFlags]  
[SetGlobalVar]  
[SetLanguage]  
[Set]  
[SetVar]  
[ImportVar]  
[Wait]  
[WaitExten]  
Asterisk Dynamic Loader Starting:  
[res\_musiconhold.so] =\> (Music On Hold Resource)  
[res\_indications.so] =\> (Indications Configuration)0 load\_module: No music on hold classes configured, disabling music on hold.  
[res\_monitor.so] =\> (Call Monitoring Resource)  
[res\_adsi.so] =\> (ADSI Resource)  
[res\_agi.so] =\> (Asterisk Gateway Interface (AGI))  
[res\_features.so] =\> (Call Features Resource)  
[res\_config\_odbc.so] =\> (ODBC Configuration)  
Jun 20 12:19:28 NOTICE[2436]: config.c:863 ast\_config\_engine\_register: Registered Config Engine odbc  
res\_config\_odbc loaded.  
[res\_odbc.so] =\> (ODBC Resource)  
Jun 20 12:19:28 NOTICE[2436]: res\_odbc.c:599 load\_module: res\_odbc loaded.  
[res\_crypto.so] =\> (Cryptographic Digital Signatures)  
[pbx\_config.so] =\> (Text Extension Configuration)  
[pbx\_spool.so] =\> (Outgoing Spool Support)  
[pbx\_dundi.so] =\> (Distributed Universal Number Discovery (DUNDi))  
Jun 20 12:19:28 ERROR[2436]: pbx\_dundi.c:4574 set\_config: Unable to load config dundi.conf  
[pbx\_loopback.so] =\> (Loopback Switch)  
[pbx\_realtime.so] =\> (Realtime Switch)  
[pbx\_ael.so] =\> (Asterisk Extension Language Compiler)  
[pbx\_functions.so] =\> (Builtin dialplan functions)  
[chan\_sip.so] =\> (Session Initiation Protocol (SIP))  
[chan\_agent.so] =\> (Agent Proxy Channel)  
Jun 20 12:19:28 NOTICE[2436]: chan\_agent.c:1036 read\_agent\_config: No agent configuration found – agent support disabled  
[chan\_mgcp.so] =\> (Media Gateway Control Protocol (MGCP))  
[chan\_iax2.so] =\> (Inter Asterisk eXchange (Ver 2))  
Jun 20 12:19:28 WARNING[2436]: chan\_iax2.c:9572 load\_module: Unable to open IAX timing interface: No such file or directory  
Jun 20 12:19:28 NOTICE[2436]: iax2-provision.c:515 iax\_provision\_reload: No IAX provisioning configuration found, IAX provisioning disabled.  
[chan\_local.so] =\> (Local Proxy Channel)  
[chan\_skinny.so] =\> (Skinny Client Control Protocol (Skinny))  
Jun 20 12:19:28 NOTICE[2436]: chan\_skinny.c:3108 reload\_config: Unable to load config skinny.conf, Skinny disabled  
[chan\_features.so] =\> (Feature Proxy Channel)  
[chan\_oss.so] =\> (OSS Console Channel Driver)  
[chan\_phone.so] =\> (Linux Telephony API Support)  
[skipping chan\_alsa.so]  
[chan\_zap.so] =\> (Zapata Telephony w/PRI)  
[skipping chan\_h323.so]  
[app\_parkandannounce.so] =\> (Call Parking and Announce Application)  
[skipping chan\_alsa.so]  
[app\_dial.so] =\> (Dialing Application)  
[app\_playback.so] =\> (Sound File Playback Application)  
[app\_voicemail.so] =\> (Comedian Mail (Voicemail System))  
[app\_directory.so] =\> (Extension Directory)  
[app\_mp3.so] =\> (Silly MP3 Application)  
[app\_system.so] =\> (Generic System() application)  
[app\_echo.so] =\> (Simple Echo Application)  
[app\_record.so] =\> (Trivial Record Application)  
[app\_image.so] =\> (Image Transmission Application)  
[app\_url.so] =\> (Send URL Applications)  
[app\_disa.so] =\> (DISA (Direct Inward System Access) Application)  
[app\_adsiprog.so] =\> (Asterisk ADSI Programming Application)  
[app\_getcpeid.so] =\> (Get ADSI CPE ID)  
[app\_milliwatt.so] =\> (Digital Milliwatt (mu-law) Test Application)  
[app\_zapateller.so] =\> (Block Telemarketers with Special Information Tone)  
[app\_setcallerid.so] =\> (Set CallerID Application)  
[app\_festival.so] =\> (Simple Festival Interface)  
[app\_queue.so] =\> (True Call Queueing)  
[app\_senddtmf.so] =\> (Send DTMF digits Application)  
[app\_lookupcidname.so] =\> (Look up CallerID Name from local database)  
[app\_setcidname.so] =\> (Set CallerID Name)  
[app\_authenticate.so] =\> (Authentication Application)  
[app\_macro.so] =\> (Extension Macros)  
[app\_lookupblacklist.so] =\> (Look up Caller\*ID name/number from blacklist database)  
[app\_softhangup.so] =\> (Hangs up the requested channel)  
[app\_hasnewvoicemail.so] =\> (Indicator for whether a voice mailbox has messages in a given folder.)  
[app\_waitforring.so] =\> (Waits until first ring after time)  
[app\_privacy.so] =\> (Require phone number to be entered, if no CallerID sent)  
[app\_db.so] =\> (Database Access Functions)  
[app\_chanisavail.so] =\> (Check channel availability)  
[app\_enumlookup.so] =\> (ENUM Lookup)  
[app\_transfer.so] =\> (Transfer)  
[app\_setcidnum.so] =\> (Set CallerID Number)  
[app\_cdr.so] =\> (Tell Asterisk to not maintain a CDR for the current call)  
[app\_setcdruserfield.so] =\> (CDR user field apps)  
[app\_sayunixtime.so] =\> (Say time)  
[app\_cut.so] =\> (Cut out information from a string)  
[app\_read.so] =\> (Read Variable Application)  
[app\_groupcount.so] =\> (Group Management Routines)  
[app\_random.so] =\> (Random goto)  
[app\_ices.so] =\> (Encode and Stream via icecast and ices)  
[app\_eval.so] =\> (Reevaluates strings)  
[app\_nbscat.so] =\> (Silly NBS Stream Application)  
[app\_sendtext.so] =\> (Send Text Applications)  
[app\_exec.so] =\> (Executes applications)  
[app\_controlplayback.so] =\> (Control Playback Application)  
[app\_txtcidname.so] =\> (TXTCIDName)  
[app\_alarmreceiver.so] =\> (Alarm Receiver for Asterisk)  
[app\_talkdetect.so] =\> (Playback with Talk Detection)  
[app\_waitforsilence.so] =\> (Wait For Silence)  
[app\_userevent.so] =\> (Custom User Event Application)  
[app\_verbose.so] =\> (Send verbose output)  
[app\_test.so] =\> (Interface Test Application)  
[app\_forkcdr.so] =\> (Fork The CDR into 2 separate entities.)  
[app\_math.so] =\> (Basic Math Functions)  
[app\_realtime.so] =\> (Realtime Data Lookup/Rewrite)  
[app\_dumpchan.so] =\> (Dump Info About The Calling Channel)  
[app\_externalivr.so] =\> (External IVR Interface Application)  
[app\_while.so] =\> (While Loops and Conditional Execution)  
[app\_setrdnis.so] =\> (Set RDNIS Number)  
[app\_md5.so] =\> (MD5 checksum applications)  
[app\_readfile.so] =\> (Stores output of file into a variable)  
[app\_chanspy.so] =\> (Listen to the audio of an active channel  
)  
[app\_dictate.so] =\> (Virtual Dictation Machine)  
[app\_stack.so] =\> (Stack Routines)  
[app\_settransfercapability.so] =\> (Set ISDN Transfer Capability)  
[app\_directed\_pickup.so] =\> (Directed Call Pickup Application)  
[app\_mixmonitor.so] =\> (Mixed Audio Monitoring Application)  
[app\_zapras.so] =\> (Zap RAS Application)  
[app\_meetme.so] =\> (MeetMe conference bridge)  
[app\_flash.so] =\> (Flash zap trunk application)  
[app\_zapbarge.so] =\> (Barge in on Zap channel application)  
[app\_zapscan.so] =\> (Scan Zap channels application)  
[app\_page.so] =\> (Page Multiple Phones)  
[skipping app\_curl.so]  
[skipping app\_sms.so]  
[skipping codec\_speex.so]  
[codec\_ilbc.so] =\> (iLBC/PCM16 (signed linear) Codec Translator)  
[codec\_gsm.so] =\> (GSM/PCM16 (signed linear) Codec Translator)  
[codec\_lpc10.so] =\> (LPC10 2.4kbps (signed linear) Voice Coder)  
[codec\_adpcm.so] =\> (Adaptive Differential PCM Coder/Decoder)  
[codec\_ulaw.so] =\> (Mu-law Coder/Decoder)  
[codec\_alaw.so] =\> (A-law Coder/Decoder)  
[codec\_a\_mu.so] =\> (A-law and Mulaw direct Coder/Decoder)  
[codec\_g726.so] =\> (ITU G.726-32kbps G726 Transcoder)  
[format\_gsm.so] =\> (Raw GSM data)  
[format\_wav.so] =\> (Microsoft WAV format (8000hz Signed Linear))  
[format\_wav\_gsm.so] =\> (Microsoft WAV format (Proprietary GSM))  
[format\_vox.so] =\> (Dialogic VOX (ADPCM) File Format)  
[format\_pcm.so] =\> (Raw uLaw 8khz Audio support (PCM))  
[format\_g729.so] =\> (Raw G729 data)  
[format\_pcm\_alaw.so] =\> (Raw aLaw 8khz PCM Audio support)  
[format\_h263.so] =\> (Raw h263 data)  
[format\_g726.so] =\> (Raw G.726 (16/24/32/40kbps) data)  
[format\_ilbc.so] =\> (Raw iLBC data)  
[format\_sln.so] =\> (Raw Signed Linear Audio support (SLN))  
[format\_au.so] =\> (Sun Microsystems AU format (signed linear))  
[format\_jpeg.so] =\> (JPEG (Joint Picture Experts Group) Image Format)  
[format\_g723.so] =\> (G.723.1 Simple Timestamp File Format)  
[cdr\_csv.so] =\> (Comma Separated Values CDR Backend)  
[cdr\_manager.so] =\> (Asterisk Call Manager CDR Backend)  
[cdr\_custom.so] =\> (Customizable Comma Separated Values CDR Backend)  
[cdr\_odbc.so] =\> (ODBC CDR Backend)  
[cdr\_pgsql.so] =\> (PostgreSQL CDR Backend)  
[cdr\_sqlite.so] =\> (SQLite CDR Backend)  
[func\_callerid.so] =\> (Caller ID related dialplan function)  
[func\_enum.so] =\> (ENUM Related Functions)  
[func\_uri.so] =\> (URI encode/decode functions)  
[skipping chan\_h323.so]  
Asterisk Ready.[/code]

– split - must split because the forum doesn’t overtake the full text –

---

<div class="post-metadata">

**Author:** ![prodigy7](https://avatars.discourse-cdn.com/v4/letter/p/7cd45c/32.png) [@prodigy7](https://community.asterisk.org/u/prodigy7)\
**Post date:** [June 20, 2006, 10:48am UTC](https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183/2 "2006-06-20T10:48:32Z")

</div>

/var/log/asterisk/debug

`Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/modules.conf
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/cdr.conf
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/rtp.conf
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/modules.conf
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context 'parkedcalls'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '700' priority 1 to parkedcalls
Jun 20 12:19:28 DEBUG[2436] res_crypto.c: Key 'freeworlddialup' loaded OK
Jun 20 12:19:28 DEBUG[2436] res_crypto.c: Key 'iaxtel' loaded OK
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/extensions.conf
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context 'default'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context 'local'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context '1und1from'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '496144xxxxxx' priority 1 to 1und1from
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '496144xxxxxx' priority 2 to 1und1from
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '496144xxxxxx' priority 3 to 1und1from
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '496144xxxxxx' priority 4 to 1und1from
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '496144xxxxxx' priority 5 to 1und1from
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context 'macro-std-exten-ael'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 1 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 2 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 3 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 4 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 5 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 'sw-4-BUSY' priority 1 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 'sw-4-BUSY' priority 2 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '_sw-4-.' priority 1 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 'a' priority 1 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 'a' priority 2 to macro-std-exten-ael
Jun 20 12:19:28 DEBUG[2436] pbx.c: Registered context 'ael-demo'
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 3 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 4 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 5 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 6 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 8 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 9 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 10 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 11 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 12 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 's' priority 7 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '2' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '2' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '3' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '3' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '500' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '500' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '500' priority 3 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '500' priority 4 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '600' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '600' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '600' priority 3 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '600' priority 4 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '_1234' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '#' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension '#' priority 2 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 't' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] pbx.c: Added extension 'i' priority 1 to ael-demo
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/sip.conf
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/sip_accounts.conf
Jun 20 12:19:28 DEBUG[2436] acl.c: 192.168.100.0/255.255.255.0/255.255.255.0 appended to acl for peer
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'SIP' (Session Initiation Protocol (SIP))
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:19:28 DEBUG[2436] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:19:28 DEBUG[2436] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:19:28 DEBUG[2436] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:19:28 DEBUG[2436] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Agent' (Call Agent Proxy Channel)
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/mgcp.conf
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'MGCP' (Media Gateway Control Protocol (MGCP))
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/iax.conf
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'IAX2' (Inter Asterisk eXchange Driver (Ver 2))
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Local' (Local Proxy Channel Driver)
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Skinny' (Skinny Client Control Protocol (Skinny))
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Feature' (Feature Proxy Channel Driver)
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/oss.conf
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Console' (OSS Console Channel Driver)
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/phone.conf
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Phone' (Standard Linux Telephony API Driver)
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/zapata.conf
Jun 20 12:19:28 DEBUG[2436] channel.c: Registered handler for 'Zap' (Zapata Telephony Driver w/PRI)
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/voicemail.conf
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: VM Review Option disabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: VM Operator break disabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: VM CID Info before msg disabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: Send Voicemail msg disabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: ENVELOPE before msg enabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: Duration info before msg enabled globally
Jun 20 12:19:28 DEBUG[2436] app_voicemail.c: We are not going to skip to the next msg after save/delete
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/queues.conf
Jun 20 12:19:28 DEBUG[2436] config.c: Parsing /etc/asterisk/enum.conf
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '34c75d2556162f2356051ff12c845dea@84.169.162.106' of Request 102: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for 4178acf602199db83f4bdfba40d28f7d@192.168.100.100 - REGISTER (No RTP)
Jun 20 12:19:29 DEBUG[2452] app_queue.c: Device 'SIP/1und1_in' changed to state '1' (Not in use)
Jun 20 12:19:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Scheduled a registration timeout for sip.1und1.de id #10
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for 307243a96d1ef48b205e7eeb27f66088@192.168.100.100 - REGISTER (No RTP)
Jun 20 12:19:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Scheduled a registration timeout for sip.1und1.de id #12
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - NOTIFY (No RTP)
Jun 20 12:19:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '6597906d61ff442f5fa01101178e856a@84.169.162.106' of Request 102: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '4f7875a327aea3d01a10cfb458130cc7@84.169.162.106' of Request 102: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '4178acf602199db83f4bdfba40d28f7d@192.168.100.100' of Request 102: Match Found
Jun 20 12:19:29 DEBUG[2453] app_queue.c: Device 'SIP/496144xxxxxx' changed to state '1' (Not in use)
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '307243a96d1ef48b205e7eeb27f66088@192.168.100.100' of Request 102: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '4178acf602199db83f4bdfba40d28f7d@192.168.100.100' of Request 103: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Registration successful
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Cancelling timeout 10
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '307243a96d1ef48b205e7eeb27f66088@192.168.100.100' of Request 103: Match Found
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Registration successful
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Cancelling timeout 12
Jun 20 12:19:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '4c1019fe5a8ec04e716b64a67816c918@1und1.de' of Request 102: Match Found
Jun 20 12:19:34 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:01 DEBUG[2445] chan_sip.c: Auto destroying call '4178acf602199db83f4bdfba40d28f7d@192.168.100.100'
Jun 20 12:20:01 DEBUG[2445] chan_sip.c: Auto destroying call '307243a96d1ef48b205e7eeb27f66088@192.168.100.100'
Jun 20 12:20:10 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:10 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:10 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:12 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:12 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:12 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:18 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:18 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:18 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:18 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:18 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2777 cost path from unknown to g723, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 3 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6970 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36150 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2777 cost path from unknown to g723, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 3 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6970 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36150 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2777 cost path from unknown to g723, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 3 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6970 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36150 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2791 cost path from ulaw to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6984 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36164 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Resetting translation matrix
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 28 cost path from g723 to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 11 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6978 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36158 cost path from g723 to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from gsm to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 19 cost path from gsm to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from gsm to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2777 cost path from unknown to g723, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 20 cost path from unknown to ulaw, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 3 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6970 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36150 cost path from unknown to unknown, via 2
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 19 cost path from unknown to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2791 cost path from ulaw to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 17 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6984 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36164 cost path from ulaw to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2776 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 2 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 19 cost path from unknown to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 6969 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 36149 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7876 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5119 cost path from unknown to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5102 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 41249 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 7866 cost path from unknown to g723, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to gsm, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5109 cost path from unknown to ulaw, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 5092 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] translate.c: Discovered 12059 cost path from unknown to unknown, via 6
Jun 20 12:20:25 DEBUG[2436] config.c: Parsing /etc/asterisk/cdr_manager.conf
Jun 20 12:20:25 DEBUG[2436] config.c: Parsing /etc/asterisk/cdr_custom.conf
Jun 20 12:20:25 DEBUG[2436] config.c: Parsing /etc/asterisk/cdr_odbc.conf
Jun 20 12:20:25 DEBUG[2436] config.c: Parsing /etc/asterisk/cdr_pgsql.conf
Jun 20 12:20:25 DEBUG[2436] config.c: Parsing /etc/asterisk/enum.conf
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:20:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '78b62f711a37dca737c548512522dd85@84.169.162.106' of Request 102: Match Found
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:20:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:20:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '0aa8713c4c74bef9235310b57229b300@84.169.162.106' of Request 102: Match Found
Jun 20 12:20:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '2362eed722eae17871eeea6835f19cae@84.169.162.106' of Request 102: Match Found
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:21:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:21:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:21:29 DEBUG[2445] acl.c: ##### Testing 212.227.15.198 with 192.168.100.0
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Target address 212.227.15.198 is not local, substituting externip
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '2b32ffc67f555b3275d3ddae45f69af6@84.169.162.106' of Request 102: Match Found
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '61fc5cd501d94f4a0568c7777629fdf7@84.169.162.106' of Request 102: Match Found
Jun 20 12:21:29 DEBUG[2445] chan_sip.c: Stopping retransmission on '22844dbc0998316a72c5b2d01b3f13f0@84.169.162.106' of Request 102: Match Found`

/var/log/asterisk/messages

`Jun 20 12:19:28 NOTICE[2436] manager.c: Unable to open management configuration manager.conf. Call management disabled.
Jun 20 12:19:28 NOTICE[2436] cdr.c: CDR simple logging enabled.
Jun 20 12:19:28 WARNING[2436] res_musiconhold.c: No music on hold classes configured, disabling music on hold.Jun 20 12:19:28 NOTICE[2436] c
onfig.c: Registered Config Engine odbc
Jun 20 12:19:28 NOTICE[2436] res_odbc.c: res_odbc loaded.
Jun 20 12:19:28 ERROR[2436] pbx_dundi.c: Unable to load config dundi.conf
Jun 20 12:19:28 NOTICE[2436] chan_agent.c: No agent configuration found -- agent support disabled
Jun 20 12:19:28 WARNING[2436] chan_iax2.c: Unable to open IAX timing interface: No such file or directory
Jun 20 12:19:28 NOTICE[2436] iax2-provision.c: No IAX provisioning configuration found, IAX provisioning disabled.
Jun 20 12:19:28 NOTICE[2436] chan_skinny.c: Unable to load config skinny.conf, Skinny disabled`

The "call-event"  
Ok, now when i call the number, following output will be added to the debug logfile:

first call and that what follows

`Jun 20 12:42:15 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for 1a93c439-2595d5ca-3919f7a6-2e67@subscriber2.interconnect.mgc.voip.telefonica.de - INVITE (With RTP)
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: * SIP extension value: 4 for call 1a93c439-2595d5ca-3919f7a6-2e67@subscriber2.interconnect.mgc.voip.telefonica.de
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: Setting NAT on RTP to 524288
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: Checking SIP call limits for device
Jun 20 12:42:15 DEBUG[2486] chan_sip.c: Stopping retransmission on '1a93c439-2595d5ca-3919f7a6-2e67@subscriber2.interconnect.mgc.voip.telefonica.de' of Response 1: Match Found
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:42:27 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:42:27 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:42:27 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Stopping retransmission on '164ed18a5786f9550838e3e72926e074@84.169.162.106' of Request 102: Match Found
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Stopping retransmission on '7a62fbc9180c75132879695177c3cf95@84.169.162.106' of Request 102: Match Found
Jun 20 12:42:27 DEBUG[2486] chan_sip.c: Stopping retransmission on '6232ca27781e8872491a5d69510ed113@84.169.162.106' of Request 102: Match Found
Jun 20 12:43:27 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:43:27 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:43:28 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:43:28 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '7e1de4b073bf05b872f881155f4446b4@84.169.162.106' of Request 102: Match Found
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '2a5ab2b8512d2bb362574f1b2f48f937@84.169.162.106' of Request 102: Match Found
Jun 20 12:43:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '0677e53658aa84de262692892be5d0fa@84.169.162.106' of Request 102: Match Found`

second call and that what follows

`Jun 20 12:44:11 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for 222dad04-37c90af1-9917b94-2eee@subscriber2.interconnect.mgc.voip.telefonica.de - INVITE (With RTP)
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: * SIP extension value: 4 for call 222dad04-37c90af1-9917b94-2eee@subscriber2.interconnect.mgc.voip.telefonica.de
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: Setting NAT on RTP to 524288
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: Checking SIP call limits for device
Jun 20 12:44:11 DEBUG[2486] chan_sip.c: Stopping retransmission on '222dad04-37c90af1-9917b94-2eee@subscriber2.interconnect.mgc.voip.telefonica.de' of Response 1: Match Found
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:44:28 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:44:28 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Allocating new SIP dialog for (No Call-ID) - OPTIONS (No RTP)
Jun 20 12:44:28 DEBUG[2486] acl.c: ##### Testing 212.227.15.197 with 192.168.100.0
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Target address 212.227.15.197 is not local, substituting externip
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '357c85554fb480f45cf4c37c5757bf46@84.169.162.106' of Request 102: Match Found
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '7f1770b946bb8bd963b80df545ead81c@84.169.162.106' of Request 102: Match Found
Jun 20 12:44:28 DEBUG[2486] chan_sip.c: Stopping retransmission on '01eb009635be82270dc95aee0be73f9e@84.169.162.106' of Request 102: Match Found`

What goes wrong? What must I do so that i can use the one sip-number as voicebox-only number?  
I hope, some one has some “kindling” ideas.

prodigy7

---

<div class="post-metadata">

**Author:** ![prodigy7](https://avatars.discourse-cdn.com/v4/letter/p/7cd45c/32.png) [@prodigy7](https://community.asterisk.org/u/prodigy7)\
**Post date:** [June 21, 2006, 8:15pm UTC](https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183/3 "2006-06-21T20:15:10Z")

</div>

Hi,

really nobody with an idea how i can solve this manner?

p7

---

<div class="post-metadata">

**Author:** ![Kevin\_P\_Massey](https://avatars.discourse-cdn.com/v4/letter/k/b38774/32.png) [@Kevin\_P\_Massey](https://community.asterisk.org/u/Kevin_P_Massey)\
**Post date:** [June 28, 2006, 10:20pm UTC](https://community.asterisk.org/t/asterisk-register-calls-but-doesnt-answere-it/7183/4 "2006-06-28T22:20:17Z")

</div>

In your [lund1from] context in extensions.conf. add  
exten =\> XXXXXXXXXXX your number,1,Answer

Then send it to your voicemails 2,3,4,5,6,etc.

Hope this helps?
